Bird Construction

Construction

FDM

PETG

Bird Construction

Problem

During the concrete pour for the University of Victoria’s engineering‑building expansion, Bird Construction had to safeguard hundreds of threaded leveling rods that would later support critical machinery. If concrete or debris contaminated the threads, crews faced labor‑intensive cleanup, project delays, and higher costs. An economical, fast, and easily removable protective solution was essential.

Solution

Morin 3D worked on site with Bird Construction to capture exact rod dimensions and understand pour‑sequence workflow. Using rapid prototyping, the team designed custom caps that snapped on with one hand and popped off just as easily. After field tests confirmed fit and ergonomics, Morin 3D produced the caps in high volume at a cost low enough to cover the entire job site.

Results

Every threaded rod stayed clean and ready for final leveling, and the cap installation‑removal cycle added virtually no time to the pour schedule. By eliminating the risk of contamination and rework, Morin 3D helped Bird Construction keep the expansion on budget and on timetable—proof of rapid, targeted problem‑solving at construction scale.

Upload Your File. Pick a Material. Print.

Get real-time pricing, lead times, and material options in just a few clicks. No back-and-forth emails. No guesswork.